Case Studies
Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

146te Yankee Drying Cylinder
Allelys successfully completed the transport and installation at Shotton Mill, Flintshire.

AK912 returns to UK market
Allelys’ AK912 mobile crane lifts critical infrastructure at Port of Sutton Bridge.

Strand jack lifts at Lostock
Allelys deliver turnkey solution at Lostock Sustainable Energy Plant.

Three abnormal loads for Hirwaun
Allelys transport and installation three abnormal loads for Hirwaun Power Station.

Allelys install 15 arch sections
Allelys played a pivotal role in supporting the Grand Surrey Canal project.

Penrhyn Castle rolling stock
Removal and transportation of 1 carriage and 6 locomotives from Penrhyn Castle.

Installation at Skelton Grange
Turbine and generator installed, through the roof of a turbine hall at a height of 22.3m.

Transportation for Slough
Allelys deliver seven scopes of work to support the project.

Complex delivery to Rothienorman
352te generator and 158te transformer delivered to Rothienorman Substation.