Factory to foundation

The precision planning and execution required within the civil sector goes hand in hand with the Allelys service offering. We’re able to provide a complete logistics solution from one point of contact, improving communication and streamlining the project.

Whether the project is for improvement works or new infrastructure our expansive service offering provides complete flexibility for our customers.

We’re able to support from the initial enquiry with feasibility studies and route surveys to advise on the best route to the construction site from the manufacturing facility, ensuring to minimise disruption along the route.

Versatile equipment fleet

Our extensive range of trailers and trailer configurations mean we’re able to transport anything from roof trusses through to bridge sections or beams and tunnel boring machines.

We can also support on-site with jacking, skidding and lifting capabilities when reaching the final destination by traditional means is not possible.

Our vast fleet includes hydraulic lift systems, cranes, skidding and jacking systems, girder frames, SPMTs, modular trailers, bespoke rolling stock trailers, beam trailers, vessel beds, wafer decks, and semi-low loaders.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s