Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

146te Yankee Drying Cylinder

Allelys successfully completed the transport and installation at Shotton Mill, Flintshire.

AK912 returns to UK market

Allelys’ AK912 mobile crane lifts critical infrastructure at Port of Sutton Bridge.

Strand jack lifts at Lostock

Allelys deliver turnkey solution at Lostock Sustainable Energy Plant.

Three abnormal loads for Hirwaun

Allelys transport and installation three abnormal loads for Hirwaun Power Station.

Allelys install 15 arch sections

Allelys played a pivotal role in supporting the Grand Surrey Canal project.

Penrhyn Castle rolling stock

Removal and transportation of 1 carriage and 6 locomotives from Penrhyn Castle.

Aerial image of a generator being lifted into a warehouse via the ceiling by an Allelys heavy lift crane

Installation at Skelton Grange

Turbine and generator installed, through the roof of a turbine hall at a height of 22.3m.

Allelys modular trailor carrying a component for the Slough Multifuel Expansion project

Transportation for Slough

Allelys deliver seven scopes of work to support the project.

Girder frame transport travelling through a narrow road surrounded by trees

Complex delivery to Rothienorman

352te generator and 158te transformer delivered to Rothienorman Substation.

Certified members mark Certified marks