Discover the equipment used and the services provided on this project by clicking the link below:

Transport of a 92te armature from Burntwood to Newport

Allelys have successfully completed the relocation of a 92te Armature from Burntwood to Newport. The Armature, which had a 3m diameter, was required to be lifted with its wooden supports. A spreader beam was utilised along with the 100te on site overhead crane. It was loaded onto modular trailers and then transported the 120 mile route to Newport.

Once on site, the transport was positioned inside the storage bay and the Armature was offloaded using Allelys 200te lift and lock jacking system.

Alongside the transportation, Allelys provide the complete solution including route studylift studylift planlift management and engineering.

slash-brand-left-s
slash-brand-right

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.