Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.
Allelys overcame a number of engineering challenges to successfully remove 1 carriage and 6 locomotives from Penrhyn Castle and transport them to 6 different locations.
Allelys are supporting the energy from waste sector by completing seven separate scopes of work, for five individual clients to supply a complete transport solution for the Slough Multifuel Expansion project.
Allelys have successfully completed the transport and installation of two units from Buckie Harbour to Rothienorman Substation.
Allelys played a pivotal role in the Slough Multifuel Expansion project and were awarded with seven separate scopes of work.
Allelys have recently completed the successful delivery of two transformers from Buckie Harbour, Banffshire in Scotland to Moray West Onshore Converter Station. The units both weighed 239te and measured 12.3m long, 4m wide and 4.6m high.
Allelys have recently completed the successful delivery of a steam turbine generator to the Port of Sutton Bridge, Spalding. The unit weighed 176te and measured 14m long, 4.8m wide and 4.5m high.
Allelys has successfully completed the 2nd of 3 packages of work for the Dogger Bank B onshore converter station, part of the world’s largest offshore wind farm.
slash-brand-left-s

Excellence Delivered

slash-brand-right

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s