Lifting gantry services

An often sought after approach within industries such as power generationfactory installations and industrial plant services, lifting gantry systems offer a practical and effective solution to heavy lifting challenges.

Our extensive fleet of lifting gantry equipment, provides a number of options when tailoring our approach to bespoke lifting requirements. Our gantry systems operate using a high capacity telescopic boom system, which can be configured in a variety of ways, utilising 2 or 4 point lift systems and a combination of lifting beam options, all dependant on the weight, dimensions, space and accessibility of and around the load. Our gantry systems also vary in lifting capacity ranging up to 900te, making them an ideal solution to for lifting and moving heavy loads, that may not be practical or suitable to be jacked from underneath.

Lifting specialist support

Allelys expert in house engineering team work diligently to understand our customers challenges and requirements.

In order to utilise our years of knowledge and experience, to design and engineer the most practical and cost effective solutions for your project delivery.

Equipment fleet

In addition to our traditional telescopic boom, hydraulic lifting gantries, Allelys own and operate an extensive fleet of lifting equipment, which includes Franna and all terrain mobile cranes that range up to 550te. We also have an extensive range of jacking systems including hydraulic climbing jack systems, which are the ideal solution for jacking up from around and underneath heavy loads, using cylindrical rams. Allelys also offer strand jack lifting systems which can be operated from gantry systems, using a configuration of hydraulic rams, connected to the load through high capacity wire strands, offering added flexibility when engineering complex lifting solutions.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.