Allelys played a pivotal role in the Slough Multifuel Expansion project and were awarded with seven separate scopes of work.

Two of the scopes of work were awarded by the same client and required Allelys to receive and deliver 10 pieces from Felixstowe to Slough and 5 pieces from Tilbury to Slough, whilst taking full responsibility for project management. The pieces, ranging in weights from just under 1te to 39.5te, included components such as a gate drive unit, feed hopper and filter chambers.

Extensive planning and complex time constraints

The first components arrived into Felixstowe on two individual vessels, with 5 pieces of project cargo on each. The geared vessel lifted the units onto Allelys trailers ready to be transported.

The cargo was transported from Felixstowe to Reading Services’ abnormal load bay and then continued to site in Slough. The components were transported in two separate moves per day, on two consecutive days.

The second components, including a pressure water tank, two semidry reactors and two raw gas ducks, arrived into Tilbury and were transported to site using vessel bridge and wafer deck trailers.

slash-brand-left-s
slash-brand-right

“This project included tight time constraints that needed to be overcome within the planning phase. The site required the delivery of the loads within dedicated time slots early in the day, however local embargoes meant that we couldn’t move through the local area before 10am. Therefore, a plan was devised to drive to Reading and then hold the cargo in the abnormal load bay until the time embargoes had passed. Then the final leg of the journey could be completed in time to arrive in the allocated time slot.” 

Explained Simon Davies, Project Manager at Allelys.

Together these projects demonstrate Allelys ability to devise bespoke transport configurations to deliver a diverse volume of cargo.

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s