Allelys were contracted to install fifteen components for the Rassau project. These components, when combined, form a synchronous condenser, which will add inertia and frequency stability to the power grid in the UK.
Allelys were required to decommission and dismantle a 100te crane with a span dimension of 18.5m. The team utilised the Enerpac 900te lift system to dismantle the crane.
Allelys were contracted to deliver two 131te transformers from Portugal to Tummel Bridge substation
Receiving the main power hall equipment and associated ancillaries at Workington port, transporting them to site and lifting to foundations.
Allelys are supporting the oil and gas sector by regularly completing the transport of large reels.
Allelys has completed the transportation, offloading and positioning of the last World War II Landing Craft in the UK.
Allelys were contracted to transport two 268.51te super grid transformers from Ipswich docks to Bramford, Ipswich.
Allelys were contracted to transport three 272te super grid transformers and two 77te shunt reactors from Peterhead Port, Aberdeenshire to Moray East Substation, New Deer, Aberdeenshire.
Installation of a 3,000te transfer press complete with feeder and de-stacker. The main components included a 172te bed, a 110te slide and a 350te crown.
Allelys were approached to lift, transport and store two of Birmingham’s most iconic and valuable statues.