Heavy Haulage

Receiving the main power hall equipment and associated ancillaries at Workington port, transporting them to site and lifting to foundations

Power

Equipment Used:

  • Modular Trailers
  • Tractor Unit
  • Standard Flat Trailer
  • Extendable Flat Trailer
  • Mobile Crane
  • Lifting Gantry
  • Strand Jacks
  • Mats
  • Stools

Share:

Services Provided:

  • Transportation
  • Installation
  • Route Study
  • Lift Plan
  • Strucutre Analysis
  • Bridge Analysis
  • Project Management
  • Engineering
  • Consultation
  • Load Spreading
  • Overbridging
  • Skidding
  • Jacking
  • Lifting
  • Load-in/Load-out
  • Swept Path Analysis
Specialist Transport

Iggesund paper mill

The units were discharged from ungeared vessel and transported at night due to the size of the load arriving into the paper mill in the early hours.

A 90te condenser, measuring 15m x 4.2m x 4.5m was the first unit to be installed. It was unloaded from the trailer using a 200te capacity gantry system, propelled into the building from the side of the generator hall, transferred onto a hydraulic skid system to be skidded above its sprung foundation, jacked and positioned onto its mountings. Due to the limited space, special modifications had to be made to the Allelys equipment to allow the condenser to be lifted through a temporary removable section of track. The neck section was then lifted into position from above and a site weld completed.

An elevation of 17m

A steam turbine weighing 233te and a generator weighing 120te were then installed on the table top above the condenser at an elevation of 17m. This was completed using a strand jack system that was rigged from the table top out through an opening in the end elevation of the building. The system lifted the units from ground level to a height of 17m before being propelled into their final location.


Hydraulic lifting gantry

Let's talk about what Allelys can do for your business

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.



We've been quite busy lately!

Rolling stock transport

Two Class 158 Units

Removal and replacement of two Class 158 units in Barmouth.

Power industry transport

Tummel transformers

Delivery of two 131te transformers from Portugal to Tummel Bridge substation.

Heavy lift engineering

Iggesund paper mill

Transporting and lifting main power hall equipment and associated ancillaries.

Certified marks Certified members mark Certified marks