Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.
Allelys have successfully installed two components, a turbine and a generator, through the roof of a turbine hall at a height of 22.3m.
Allelys have successfully completed the transport and installation of two units from Buckie Harbour to Rothienorman Substation.
Allelys have successfully completed the first delivery, a 327.5te generator, to Progress Power Station in Eye, an Open Cycle Gas Turbine (OCGT) power peaking plant, owned by Progress Power Limited (PPL), a subsidiary business of Drax Group.
Allelys have recently completed the successful delivery of a steam turbine generator to the Port of Sutton Bridge, Spalding. The unit weighed 176te and measured 14m long, 4.8m wide and 4.5m high.
As part of a full turnkey solution, Allelys delivered and installed eight transformers across two separate projects for the Kergord Energy Substation and Viking Energy Substation on the Shetland Islands.
Allelys have provided the full service solution to offload, deliver and install four transformers, weighing 255te, at Dogger Bank Wind Farm.
Allelys were contracted to deliver two 131te transformers from Portugal to Tummel Bridge substation
Receiving the main power hall equipment and associated ancillaries at Workington port, transporting them to site and lifting to foundations.
Allelys were contracted to transport two 268.51te super grid transformers from Ipswich docks to Bramford, Ipswich.
slash-brand-left-s

Excellence Delivered

slash-brand-right

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s