Iggesund paper mill

The units were discharged from ungeared vessel and transported at night due to the size of the load arriving into the paper mill in the early hours.

A 90te condenser, measuring 15m x 4.2m x 4.5m was the first unit to be installed. It was unloaded from the trailer using a 200te capacity gantry system, propelled into the building from the side of the generator hall, transferred onto a hydraulic skid system to be skidded above its sprung foundation, jacked and positioned onto its mountings. Due to the limited space, special modifications had to be made to the Allelys equipment to allow the condenser to be lifted through a temporary removable section of track. The neck section was then lifted into position from above and a site weld completed.

slash-brand-left-s
slash-brand-right

An elevation of 17m

A steam turbine weighing 233te and a generator weighing 120te were then installed on the table top above the condenser at an elevation of 17m. This was completed using a strand jack system that was rigged from the table top out through an opening in the end elevation of the building. The system lifted the units from ground level to a height of 17m before being propelled into their final location.

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s