Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys have delivered a Yankee dryer pressure vessel, weighing 137te, to a paper mill in Barrow in Furness.
Allelys have successfully completed the relocation of a 92te Armature from Burntwood to Newport. The Armature, which had a 3m diameter, was required to be lifted with its wooden supports.
Allelys were contracted to lift the engine, manoeuvre it out of the manufacturing facility, transport it to Felixstowe and offload it at the docks, all within the same day.
Allelys were required to decommission and dismantle a 100te crane with a span dimension of 18.5m. The team utilised the Enerpac 900te lift system to dismantle the crane.
Allelys have successfully completed 7 installations of the largest aluminium die cast machines in the UK
Allelys were contracted to transport the modules from an existing engine plant, where they have been in stored, to a new electric car plant in Whitley.
Installation of a 3,000te transfer press complete with feeder and de-stacker. The main components included a 172te bed, a 110te slide and a 350te crown.
slash-brand-left-s

Excellence Delivered

slash-brand-right

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s