As part of a full turnkey solution, Allelys delivered and installed eight transformers across two separate projects for the Kergord Energy Substation and Viking Energy Substation on the Shetland Islands.
Allelys have provided the full service solution to offload, deliver and install four transformers, weighing 255te, at Dogger Bank Wind Farm.
Allelys have delivered a Yankee dryer pressure vessel, weighing 137te, to a paper mill in Barrow in Furness.
Allelys have successfully completed the transport and installation of a 113te reactor for Frodsham substation. The reactor, measuring 6.5m (l) x 2.7m (w) x 4m (h) was received at Immingham port and transported to Frodsham using 12 axle lines of modular trailers.
Allelys have recently completed the delivery of two 199te rotors and two 62te stators for Keith Substation in Scotland.
Allelys have successfully completed the relocation of a 92te Armature from Burntwood to Newport. The Armature, which had a 3m diameter, was required to be lifted with its wooden supports.
Allelys have successfully delivered ten 48m long bridge beams as part of the M6 Junction 10 improvement scheme. The project was split into two phases, with five beams delivered in July and five in September.
Allelys have recently supported an energy from waste project by offloading 23 items from the vessel, placing them into temporary storage and then transporting them to site.
Allelys were contracted to install fifteen components for the Rassau project. These components, when combined, form a synchronous condenser, which will add inertia and frequency stability to the power grid in the UK.
Allelys were contracted to deliver two 131te transformers from Portugal to Tummel Bridge substation