Allelys completed the removal and replacement of two 40te Class 158 diesel multiple unit (DMU) trains in Barmouth.
Allelys were required to decommission and dismantle a 100te crane with a span dimension of 18.5m. The team utilised the Enerpac 900te lift system to dismantle the crane.
Allelys were contracted to deliver two 131te transformers from Portugal to Tummel Bridge substation
Receiving the main power hall equipment and associated ancillaries at Workington port, transporting them to site and lifting to foundations.
Lifting and transportation of a 1.5te swim spa from Swadlincote to Bournemouth. Allelys services were required to lift the swim spa out of a back garden within a residential area.
Allelys are supporting the oil and gas sector by regularly completing the transport of large reels.
Allelys have successfully completed 7 installations of the largest aluminium die cast machines in the UK
Allelys were contracted to transport the modules from an existing engine plant, where they have been in stored, to a new electric car plant in Whitley.
Allelys were awarded the contract to transport 290 brand new diesel and electric multiple unit vehicles from Spain and Newport to Liverpool.