Allelys executed a unique beach landing, transport and installation operation for a 155te transformer in Wales.
Allelys have successfully completed the transport of four units from Belfast Harbour to Kilroot Power Station in Northern Ireland. The heaviest loads to be transported on Northern Ireland’s road network.
Allelys have provided the full service solution to offload, deliver and install four transformers, weighing 255te, at Dogger Bank Wind Farm.
Allelys have delivered a Yankee dryer pressure vessel, weighing 137te, to a paper mill in Barrow in Furness.
Allelys have executed the UK’s first-ever double girder frame convoy while delivering a reactor and transformer to National Grid, Ninfield Substation.
Allelys have successfully completed the transport and installation of a 113te reactor for Frodsham substation. The reactor, measuring 6.5m (l) x 2.7m (w) x 4m (h) was received at Immingham port and transported to Frodsham using 12 axle lines of modular trailers.
Allelys have recently completed the delivery of two 199te rotors and two 62te stators for Keith Substation in Scotland.
Allelys have successfully completed the relocation of a 92te Armature from Burntwood to Newport. The Armature, which had a 3m diameter, was required to be lifted with its wooden supports.
Allelys have successfully delivered ten 48m long bridge beams as part of the M6 Junction 10 improvement scheme. The project was split into two phases, with five beams delivered in July and five in September.