Landing Craft project

Allelys has completed the transportation, offloading and positioning of a World War II Landing Craft. Weighing 220te and measuring 57.4m in length, the Landing Craft is the last one in the UK, one of the last in world and was a campaign veteran of the D-Day landings.

Using 24 axle lines of SPMT in a 2 x 4 file configuration, Allelys transported the Landing Craft 100 metres from its restoration location at Portsmouth Naval Base to the barge location. It was then rolled onto the barge, transported to Southsea and rolled off the barge.

Delivery to the National Museum of the Royal Navy

Allelys transported the piece 800 metres to Clarence Esplanade and jacked it down using 8 synchronised climbing jacks. A 200te mobile crane was then utilised to load a Churchill tank and a Sherman tank onto the Landing Craft. The final stage was to skid the piece, using 4 lines of heavy duty skidding equipment, into its final position.

In addition to the transportation and offloading, Allelys were contracted to provide the full scope of engineering and project management including transport studies, stability calculations, load calculations and offloading methodology from the beached barge to land side.

slash-brand-left-s
slash-brand-right

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s