Bridge section installation equipment

Allelys understand that bridge installation projects vary significantly and each project has its own bespoke requirements and challenges. At Allelys we pride ourselves on our ability to help our customers overcome these challenges, by utilising our knowledge and expertise to identify and select from our extensive catalogue of equipment, the most practical and cost effective approach to the project.

Our Fleet of equipment includes a variety of different capacity hydraulic jacking and skidding systems, strand jacks, lifting gantry systems along with an extensive fleet of all terrain mobile cranes. All of which allow Allelys to engineer the best possible solution to your bridge section installation requirements.

Bridge installation support

By tailoring bespoke installation solutions to the project requirements using our extensive fleet, we are even able to support the more challenging of bridge installation projects.

Our fleet of mobile cranes allows us to execute bridge section projects that are solely crane lift installations. Where as our jacking and skidding systems allow for more complex installation techniques when required. Our fleet of SPMTs (Self Propelled Modular Transporters) are often used in support of installations to transport the bridge sections to and from the bridge installation area, due to their high manoeuvre capability across challenging terrain.

Full service solution

Our expert in house engineering team, are able to work closely with our customers to fully understand our customers’ requirements and engineer the best possible solution, for a successful project delivery.

Allelys are also able to support bridge removal and replacement projects, and can also offer transportation services to provide bridge section transport to site ready for installation and also from site for disassembly.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.