slash-brand-left

Transformer storage solutions

Allelys private indoor and outdoor storage includes bonded storage for reactors and transformers.

We know that access to all major routes is imperative and Allelys storage depot offers the prime location, sitting centrally in the UK. In addition to the safe storage of transformers, we also provide transportation. Allelys provide a full-service solution, from one point of contact, to ensure that your project is taken care of from start to finish.

Transformer transportation

When required, our customers can request the transportation of goods to or from our facility.

Our storage premises are monitored under RHA warehousing conditions. Allelys’ superbly trained and highly qualified in-house engineers work diligently across a vast array of industry sectors. Amongst our advanced fleet are our girder framesSPMTs and modular trailers which offer safe transportation options for transformers, turbines and generators across the UK and Europe.

Allelys own and operate the full spectrum of transformer transport. Our competent team are available to guide your project through to completion – on time and within budget.

Specialist support

Our specialist girder frames offer unique manoeuvrability across routes with height and weight restrictions. In circumstances where space is limited, we offer our modern fleet of SPMTs (Self Propelled Modular Trailers), to move transformers securely to their desired destination, before installation through jacking, skidding or lifting techniques.

Allelys offer a full installation and logistics service from just one point of contact. Our team of engineers and project managers provide valuable support during the FEED stage of a project, offering services such as feasibility studies and route surveys alongside exceptional design and fabrication skills. There is no problem too big or small for Allelys.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s