slash-brand-left

Bridge Jack Up Services

Allelys has specialised in the heavy lift industry for decades, becoming a leading solution provider to our customers heavy lifting needs.

Over the years our experience and capabilities have gone from strength to strength and we continue to offer our customers an effective tailored approach, to all their bridge jack up requirements.

Bridge and Bridge Section Jack Up

Our wide fleet of hydraulic jacking and skidding systems allow us to tailor our approach to individual project requirements.

We have the capacity to jack up bridges and bridge sections of varying weights and designs, allowing for bridge installations, removals, replacements or weighing’s to be effectively executed. We also offer other jacking techniques such as strand jacks which allow for bridges and bridge sections to be raised up from above, using wire strands rather than hydraulic jacking cylinders. Our diverse range of equipment allows us to create the most practical and effective solution for our customers bridge jack up requirements.

Bridge Jack Up Support

Allelys extensive fleet of equipment, allows our in house engineering team to design the most cost effective solutions to our customers bridge jack up challenges. Our team have in depth knowledge and experience in delivering jacking projects and are available to support the project throughout its duration.

In addition to our bridge jack up capabilities we have a wide fleet of SPMTs (Self Propelled Modular Transporters) which provide heavy lift transport solutions for onsite transportation requirements. Their manoeuvrability capabilities provide options to move loads around tight and restrictive sites, often moving bridge sections from their temporary positions to their required destinations ready for installation.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s