Allelys have successfully completed the relocation of a 92te Armature from Burntwood to Newport. The Armature, which had a 3m diameter, was required to be lifted with its wooden supports.
Allelys have successfully delivered ten 48m long bridge beams as part of the M6 Junction 10 improvement scheme. The project was split into two phases, with five beams delivered in July and five in September.
Allelys played a key role in the Hornsea 2 project by delivering and installing 11 units including two 84te shunt reactors, three 135te transformers, three 208te reactors and three 240te transformers.
Allelys have provided the full service solution to offload, deliver and install four transformers, weighing 255te, at Dogger Bank Wind Farm.
Allelys were contracted to install fifteen components for the Rassau project. These components, when combined, form a synchronous condenser, which will add inertia and frequency stability to the power grid in the UK.
Allelys completed the removal and replacement of two 40te Class 158 diesel multiple unit (DMU) trains in Barmouth.
Allelys were contracted to deliver two 131te transformers from Portugal to Tummel Bridge substation
Receiving the main power hall equipment and associated ancillaries at Workington port, transporting them to site and lifting to foundations.
Allelys are supporting the oil and gas sector by regularly completing the transport of large reels.
Allelys have successfully completed 7 installations of the largest aluminium die cast machines in the UK