Allelys executed a unique beach landing, transport and installation operation for a 155te transformer in Wales.
Allelys have successfully completed the transport of four units from Belfast Harbour to Kilroot Power Station in Northern Ireland. The heaviest loads to be transported on Northern Ireland’s road network.
Allelys have provided the full service solution to offload, deliver and install four transformers, weighing 255te, at Dogger Bank Wind Farm.
Allelys have executed the UK’s first-ever double girder frame convoy while delivering a reactor and transformer to National Grid, Ninfield Substation.
Allelys have successfully completed the transport and installation of a 113te reactor for Frodsham substation. The reactor, measuring 6.5m (l) x 2.7m (w) x 4m (h) was received at Immingham port and transported to Frodsham using 12 axle lines of modular trailers.
Allelys played a key role in the Hornsea 2 project by delivering and installing 11 units including two 84te shunt reactors, three 135te transformers, three 208te reactors and three 240te transformers.
Allelys have recently transported, offloaded and installed a transformer weighing 184te. The cargo was received at Ipswich Docks onto a 12 axle flat top trailer and shunted to a temporary storage area.
Allelys were contracted to install fifteen components for the Rassau project. These components, when combined, form a synchronous condenser, which will add inertia and frequency stability to the power grid in the UK.
Allelys were contracted to deliver two 131te transformers from Portugal to Tummel Bridge substation
Receiving the main power hall equipment and associated ancillaries at Workington port, transporting them to site and lifting to foundations.