Allelys played a key role in the Hornsea 2 project by delivering and installing 11 units including two 84te shunt reactors, three 135te transformers, three 208te reactors and three 240te transformers.
Allelys have recently transported, offloaded and installed a transformer weighing 184te. The cargo was received at Ipswich Docks onto a 12 axle flat top trailer and shunted to a temporary storage area.
Allelys were contracted to install fifteen components for the Rassau project. These components, when combined, form a synchronous condenser, which will add inertia and frequency stability to the power grid in the UK.
Allelys were contracted to deliver two 131te transformers from Portugal to Tummel Bridge substation
Receiving the main power hall equipment and associated ancillaries at Workington port, transporting them to site and lifting to foundations.
Allelys were contracted to transport two 268.51te super grid transformers from Ipswich docks to Bramford, Ipswich.
Allelys were contracted to transport three 272te super grid transformers and two 77te shunt reactors from Peterhead Port, Aberdeenshire to Moray East Substation, New Deer, Aberdeenshire.
Allelys successfully completed the transport of 8 transformers as part of the Caithness Moray HVDC Link project.