Allelys have successfully completed the transport of four units from Belfast Harbour to Kilroot Power Station in Northern Ireland. The heaviest loads to be transported on Northern Ireland’s road network.
Allelys have provided the full service solution to offload, deliver and install four transformers, weighing 255te, at Dogger Bank Wind Farm.
Allelys have successfully completed the transport and installation of a 113te reactor for Frodsham substation. The reactor, measuring 6.5m (l) x 2.7m (w) x 4m (h) was received at Immingham port and transported to Frodsham using 12 axle lines of modular trailers.
Allelys have successfully completed the relocation of a 92te Armature from Burntwood to Newport. The Armature, which had a 3m diameter, was required to be lifted with its wooden supports.
Allelys have successfully completed 7 installations of the largest aluminium die cast machines in the UK
Installation of a 3,000te transfer press complete with feeder and de-stacker. The main components included a 172te bed, a 110te slide and a 350te crown.