slash-brand-left

Transport and heavy lift consultants

All of our projects are engineered in-house, by a team who develop bespoke solutions for individual project requirements by working closely with our customers.

We believe every challenge, no matter how big or small, is better tackled as a team. We enjoy projects that test us and the knowledge and experience within the team means we excel on even the most complex projects.

A Complete Solutions Provider

Our team of transport and heavy lift consultants are on hand to support projects by completing route reports, route surveys, swept path analysis, designing and engineering overbridging solutions as well as bespoke heavy transport arrangements, producing risk assessments and method statements, creating lift plans, specifying the lifting tackle required and designing lifting frames.

We’re able to support this planning phase as consultants, or alternatively Allelys then have the equipment fleet to complete the transport and lifting project scope.

Consultancy across every sector

Our in-house engineering team are available to support customers across every sector. With knowledge and experience in engineering, transporting and lifting a multitude of overweight and oversized cargo including:

These are in addition to our experience within the agriculture and horticulture sector as well as museums and heritage projects where our expertise are often called upon to provide solutions for cargo that is not only valuable, but also irreplaceable.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.