slash-brand-left

Discover the equipment used and the services provided on this project by clicking the link below:

Transportation from Telford to Felixstowe

Allelys were contracted to lift the engine, manoeuvre it out of the manufacturing facility, transport it to Felixstowe and offload it at the docks, all within the same day.

bespoke lifting solution was required to accommodate the manufacturers lifting points built into the unit. The Allelys team engineered a three lift beam arrangement to be used in conjunction with a 200te capacity hydraulic gantry system to lift the engine.

The port drum engine was then manoeuvred out of the facility with extreme precision due to the restricted space available. It was loaded onto a wafer bed trailer, transported to Felixstowe and offloaded at the docks.

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s