Allelys overcame a number of engineering challenges to successfully remove 1 carriage and 6 locomotives from Penrhyn Castle and transport them to 6 different locations.
Allelys are supporting the energy from waste sector by completing seven separate scopes of work, for five individual clients to supply a complete transport solution for the Slough Multifuel Expansion project.
Allelys played a pivotal role in the Slough Multifuel Expansion project and were awarded with seven separate scopes of work.
Allelys have recently contributed to a heat exchanger project in Teesside, by delivering a series of vessels from Teesport to Lazenby.
Allelys have successfully completed the transport of four silo’s from Corby to Fareham. The silo’s, each weighing 6te, had a 4.2m diameter and measured 22.4m in length.
Allelys were contracted to lift the engine, manoeuvre it out of the manufacturing facility, transport it to Felixstowe and offload it at the docks, all within the same day.