Allelys have recently supported an energy from waste project by offloading 23 items from the vessel, placing them into temporary storage and then transporting them to site.
Allelys have recently removed and transported one of Birmingham’s iconic statues. Affectionately known as the “Floozy in the Jacuzzi” but officially The River and Youth statues.
Allelys were contracted to transport seven CBD90 locomotives from Burton on Trent, Staffordshire to Port Talbot in Wales.
Allelys have successfully completed the transport of four silo’s from Corby to Fareham. The silo’s, each weighing 6te, had a 4.2m diameter and measured 22.4m in length.
Allelys were contracted to lift the engine, manoeuvre it out of the manufacturing facility, transport it to Felixstowe and offload it at the docks, all within the same day.
Allelys played a key role in the Hornsea 2 project by delivering and installing 11 units including two 84te shunt reactors, three 135te transformers, three 208te reactors and three 240te transformers.
Allelys have recently transported, offloaded and installed a transformer weighing 184te. The cargo was received at Ipswich Docks onto a 12 axle flat top trailer and shunted to a temporary storage area.
Allelys have provided the full service solution to offload, deliver and install four transformers, weighing 255te, at Dogger Bank Wind Farm.
Allelys were contracted to install fifteen components for the Rassau project. These components, when combined, form a synchronous condenser, which will add inertia and frequency stability to the power grid in the UK.