Steam Turbine Transport
Steam Turbine Transport
Allelys stand-out as primary provider of specialist transportation and installation of steam turbines across the UK and Europe.
Steam turbine transport solutions
Allelys possess an enormous equipment fleet that provides the specialist capability required for steam turbine transport and installation. The constant renewal in investment ensures that we only offer the most modern high-tech equipment available.
Our Self-propelled modular trailers (SPMTs) are crucial for safely transporting power plant equipment within limited spaces. Allelys advanced jacking, skidding and lifting systems support the precise positioning of steam turbines, avoiding any harm or damage.
Steam turbine transport services
In addition to this, we offer girder frames and modular trailers. When challenged by infrastructure height and weight restrictions, our skilled in-house team operate our girder frames to transport generators, turbines and transformers.
Our wide fleet of girder frame trailers allow us to select the most appropriate transport configuration for your load. The many advantages to this transport arrangement include the trailers’ ability to cradle the load with a lower running height and spread the weight more suitably, across a wider surface area. This allows for more flexibility and options when route planning and submitting permit applications.
Transport Support
Allelys are aware of the complexity of manoeuvring steam turbines. We readily offer expert technical assistance along with bespoke design and fabrication capabilities to procure every detail is attended to. Our advanced logistics service allows us to work closely with our customers and oversee the project to completion. Crucial route surveys, feasibility studies and lifting and installation studies are carried out to assure that the most time and cost-effective methods are utilised.
Across 12-acres of private and secure land are our spacious storage and warehousing facilities. Our indoor and outdoor options allow ample room for transformers, reactors and bonded storage. Our facilities are monitored at all times and offer vital access to all main roads throughout the UK.
Excellence
Delivered
Case Studies
Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.
Lets Talk...
We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.