slash-brand-left

Heavy duty modular trailers

The modular system allows taller cargo to sit closer to the road, and for various ground pressures to be achieved by sharing the load over more axles and a larger area. It also allows for more difficult driving routes to be utilised as different configurations give more manoeuvrability. Using options such as a girder frame also allows the load to be lifted and lowered throughout the transportation to clear bridges and walls.

Allelys own 2, 3, 4, 5 and 6 axle combination sets allowing for variable trailer lengths and multiple widths. They also provide the in-house engineering team with the flexibility to specify the optimum transport configuration for even the most challenging of loads.

Our modular trailer fleet

Modular trailers are most commonly used when longer transport routes are required. The trailers are operated in conjunction with a tractor unit. We’ve categorised our fleet into bogies, drawbar / flat top trailers and vessel bed trailers:

Bogies – a set of axles. A girder frame can be used to carry the load between the bogies or alternatively the load can span the two bogies to form a connection. To enable the bogies to turn independently of the load, a turntable can be positioned on top of the bogies.

Drawbar / flat top trailers – where a number of axles follow the drawbar. When using this method, the load sits directly on the axles.

Vessel bed trailers – where the cargo sits on beams which are positioned between two sets of axles. This methodology is ideal for routes with height restrictions as the cargo can sit directly on the beams themselves or on the flanges of the beams.

Allelys own 2, 3, 4, 5 and 6 axle combination sets allowing for variable trailer lengths and multiple widths.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s