Discover the equipment used and the services provided on this project by clicking the link below:

Transporting MTB 71 and CMB 331

Allelys were contracted to transport two historic boats from the Royal Navy Fleet Air Arm Museum in Yeovilton to the Explosion Museum of Naval Firepower in Gosport.

MTB 71 is a Motor Torpedo Boat weighing 15te, and is said to be the last wartime motor torpedo boat of its kind in existence. Measuring 18.1m (l) x 4.6m (w) x 3.9m (h), it’s the largest of the two and required to be transported under Police escort. CMB 331 measures 17m (l) x 3.5m (w) x 3.3m (h), weighs 15te and is the last surviving Thornycroft 55 foot Coastal Motor Boat.

Providing the full project scope of work

The boats were being stored on frames, so Allelys used these frames to jack up the vessels using climbing jacks. They were then transported using 4 axle Goldhofer extendable trailers. Once on site, the boats were jacked up off the trailers, lowered onto skates, where they were then skated into the building to their final positions.

In addition, Allelys also transported ancillary equipment for the vessels. The equipment, which included the bridges that were removed to reduce the height during transport, were lifted by a 15te capacity Franna crane onto the curtainsider for transport.

slash-brand-left-s
slash-brand-right

“Allelys are involved with projects across a wide range of sectors, but it is always great to be involved in a project like this where the loads being transported have so much history. Delivering them to the Explosion Museum of Naval Firepower means that they can now be on display for the public to enjoy too.”

explained Zac Smout, Senior Project Manager at Allelys.

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.