slash-brand-left

Substation relocation heavy lifting services

Our extensive fleet of equipment caters for a range of substation relocation demands. Whether the project requires, transportation, installation, removal or replacement, Allelys have the solution to your project needs.

At Alleys we understand all substation relocations have different requirements and challenges, so within our extensive fleet of equipment we have a range of options to utilise. Our heavy lift jacking and skidding systems provide the necessary capabilities to lift and relocate substation components such as transformers and relocate them in their desired destination.

Substation relocation solutions

When it’s not practical to jack up from around or beneath the piece, we can engineer a complete solution using our fleet of hydraulic gantry lifting systems, which range up to 900te and offer a variety of capacities and configurations, depending on the project requirements.

Allelys girder frame fleet are ideal road transport solutions for large substation loads to and from site and provide the perfect service to negotiate UK infrastructure. Our SPMTs (Self Propelled Modular Transporters) are high capacity trailers, excellent for transhipment or site moves of large or heavy loads across challenging routes and terrain, due to their advanced manoeuvrability and range of configurations.

Substation relocation support

Our relocation operations are supported by our extended fleet of equipment, that includes modular trailers, all terrain mobile cranes ranging from 25te to 550te and our Franna cranes with a capacity of up to 15te for smaller loads.

Each project is supported by our expert in house engineering team, who with years of experience work closely with our customers from start to finish, to design a bespoke engineering solution that provides the most practical and cost effective service for our customers project requirements.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s