slash-brand-left

Steam train haulage services

As an industry-leading, family-owned and run business, Allelys prides itself on its exceptional reputation and superior service. Consistent investment in our equipment fleet enables us to offer the most progressive solutions to your stream train haulage challenges.

Our diverse fleet ranges from modular trailers, girder frames, wafer decks, SPMTs, beam trailers and vessel beds, rolling stock trailers to semi-loaders. No matter how big or small our highly qualified and accomplished team always deliver on time and within budget.

At Allelys, Health, Safety, Environment and Quality are predominant throughout all projects. From the primary point of contact to the final detail, Allelys cover it all. Diligence and investment are instrumental to our exemplary in-house engineers and wide-ranging equipment fleet. Our on-hand, expert team take care of permits, route surveys, project management and engineering, ro-ro operations, transportation and crane lifts.

Steam train haulage extras

Allelys fleet enables us to own and operate the most advanced heavy haulage transport and installation equipment.

From a 10te tanker wagon to a 26m long railway coach to a 140te mainly locomotive, Allelys can cover all of your heavy haulage and rolling stock needs. In the minority of projects, when the cargo requires lifting by crane – rather than loading via our ramp and winch method – we offer a full contract lift service. Our Franna pick and carry cranes support 15te capacity loads, whilst our variety of all-terrain mobile cranes lift weights of 25te to 550te capacity.

Haulage support

We also offer our acres of warehouse and storage facilities, providing secure and monitored space, indoors and out which has convenient access to all main roads across the UK.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.