Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.
Allelys played a pivotal role in the Grand Surrey Canal project with the site transport and installation of 15 precast concrete arch sections.
Allelys have successfully installed two components, a turbine and a generator, through the roof of a turbine hall at a height of 22.3m.
Allelys successfully completed the lift, transport and installation of a 600te, 42m long railway bridge at Castleton Junction. By designing an innovative and bespoke engineering solution, the team overcame major site and operational constraints.
Allelys have successfully completed the transport and installation of two units from Buckie Harbour to Rothienorman Substation.
Allelys have recently completed the successful delivery of two transformers from Buckie Harbour, Banffshire in Scotland to Moray West Onshore Converter Station. The units both weighed 239te and measured 12.3m long, 4m wide and 4.6m high.
Allelys has successfully completed the 2nd of 3 packages of work for the Dogger Bank B onshore converter station, part of the world’s largest offshore wind farm.
As part of a full turnkey solution, Allelys delivered and installed eight transformers across two separate projects for the Kergord Energy Substation and Viking Energy Substation on the Shetland Islands.