Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.
Allelys played a pivotal role in the Grand Surrey Canal project with the site transport and installation of 15 precast concrete arch sections.
Allelys overcame a number of engineering challenges to successfully remove 1 carriage and 6 locomotives from Penrhyn Castle and transport them to 6 different locations.
Allelys successfully completed the lift, transport and installation of a 600te, 42m long railway bridge at Castleton Junction. By designing an innovative and bespoke engineering solution, the team overcame major site and operational constraints.
Allelys are supporting the energy from waste sector by completing seven separate scopes of work, for five individual clients to supply a complete transport solution for the Slough Multifuel Expansion project.
Allelys have successfully completed the transport and installation of two units from Buckie Harbour to Rothienorman Substation.
Allelys played a pivotal role in the Slough Multifuel Expansion project and were awarded with seven separate scopes of work.