Allelys have successfully completed the relocation of a 92te Armature from Burntwood to Newport. The Armature, which had a 3m diameter, was required to be lifted with its wooden supports.
Allelys were contracted to install fifteen components for the Rassau project. These components, when combined, form a synchronous condenser, which will add inertia and frequency stability to the power grid in the UK.
Installation of a 3,000te transfer press complete with feeder and de-stacker. The main components included a 172te bed, a 110te slide and a 350te crown.