Allelys support Grand Surrey Canal Project

Allelys played a pivotal role in the Grand Surrey Canal project with the site transport and installation of 15 precast concrete arch sections. The sections, each weighing 17.5te and measuring up to 11.4m in length were received, manoeuvred and installed using Allelys’ fleet of specialist equipment.

The project presented the unique challenge of installing the units underneath the existing structure as the new construction sits underneath a historic railway bridge. Allelys’ engineering team were tasked with designing a solution, ensuring that meticulous precision was key.

In-house engineering

After the initial engineering stage was complete, SPMT’s were identified as the most suitable transport arrangement. A 160te mobile telescopic crane was used to individually load each arch section onto a 6 axle SPMT, with the trailers hydraulic controls providing millimetre accuracy to control the level and final positioning of each unit.

To ensure the stability of the load during transportation, bespoke timber packers were fabricated to match the unique profile of each arch. This in-house capability was crucial to the success of the project and for maintaining the integrity of the structures throughout the process.

slash-brand-left-s
slash-brand-right

Developing a unique solution

“Collaboration and innovative problem solving were key to developing this unique solution, ensuring that the project was executed as safely and precisely as planned,” explained Neil Jones, Senior Commercial Manager at Allelys.

“This project will now progress to a subsequent operation that will involve the removal of the main bridge beam from the existing overhead structure, paving the way for the construction of the new bridge deck section.”

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.