Birmingham statues

During a tramline extension in Birmingham, the location of the construction work meant that two statues needed to be temporarily uplifted, stored and then carefully reinstated once the work had been completed.

The Iron Man statue, which weighed 7te and the Boulton, Watt and Murdoch statue, which weighed 6te were both located in busy, high-profile city centre locations. The project required a substantial amount of planning and preparation as well as close collaboration with local authorities.

A solution was devised to use a tandem lift for the Iron Man statue. Utilising a 55te capacity mobile crane and a 15te capacity Hiab to top and tail the statue. It was then lowered horizontally into a crate before being packed and lifted onto the Hiab for onward transport to the Allelys depot for storage.

slash-brand-left-s
slash-brand-right

Working to heritage standards for the protection of the statues

In addition to the lift plans that were created for both lifts, the Boulton, Watt and Murdoch statue also required additional bracing to be designed, fabricated and implemented. Once lifted from its plinth, a crate was built around the golden statue and additional bracing within the crate inserted for protection during transport on the Hiab.

We employed specialist conservators to manage the conservation to the correct heritage standards for the handling, packing, storage and cleaning / maintenance of both pieces whilst in storage, and pre and post inspections of both statues were conducted.

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s