Allelys overcame a number of engineering challenges to successfully remove 1 carriage and 6 locomotives from Penrhyn Castle and transport them to 6 different locations.
Allelys have executed the UK’s first-ever double girder frame convoy while delivering a reactor and transformer to National Grid, Ninfield Substation.
Allelys have successfully completed the transport and installation of a 113te reactor for Frodsham substation. The reactor, measuring 6.5m (l) x 2.7m (w) x 4m (h) was received at Immingham port and transported to Frodsham using 12 axle lines of modular trailers.