slash-brand-left

Discover the equipment used and the services provided on this project by clicking the link below:

Seven CBD90 locomotives

Allelys were contracted to transport seven CBD90 locomotives from Burton on Trent, Staffordshire to Port Talbot in Wales. 

The locomotives, each weighing 90te, required custom built rail trailers due to their weight. Measuring 13.64m (l) x 2.7m (w) x 3.57m (h), the transports also required private escorting, which Allelys provided with our own fleet of escort vehicles. The CBD90 locomotives are capable of moving 2,500te with battery charging from a 3-phase supply.

slash-brand-left-s
slash-brand-right

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s