Transportation of four silo's for the agriculture industry

Allelys have successfully completed the transport of four silo’s from Corby to Fareham.

The silo’s, each weighing 6te, had a 4.2m diameter and measured 22.4m in length. Due to the length of the units, a bespoke trailer configuration was required. A solution was designed using extended wafer bed trailers with additional beams to transport the four silo’s in convoy across the 145 mile route.

slash-brand-left-s
slash-brand-right

More Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s