slash-brand-left

Specialist equipment

Providing heavy lift and transportation services across all ports and shipyards within the UK. The continuous investment in our equipment fleet ensures that we have the ability to offer a bespoke solution for each and every project.

Whether the requirement is to transport heavy fabrications, yachts or ships from fabrication yards or to jack and skid ships components, our experienced team are problem solvers and are on hand to ensure the project is delivered to the highest standards.

Complete project solutions

We work closely with our customers and support them through every stage from the initial enquiry through to project completion.

Our team of engineers and project managers support projects during the FEED stage. In addition, our in-house design and fabrication capabilities mean that if we don’t have the suitable equipment, we’ll design and fabricate it specially.

Our vast fleet includes hydraulic lift systems, cranes, skidding and jacking systems, girder frames, SPMTs, modular trailers, bespoke rolling stock trailers, beam trailers, vessel beds, wafer decks, and semi-low loaders.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s