slash-brand-left

Warehousing and storage

When the Allelys business was founded in 1959 the company specialised in the transport of livestock and since that day the agriculture and horticulture sector has remained an important part of the business. Although we’ve now diversified away from livestock, we offer a range of solutions to meet our customers needs within the agriculture sector.

Our warehouse facilities are centrally located within the UK, secure and offered under RHA warehousing conditions. Large-scale producers are able to turn to Allelys for the full handling service from a single pallet up to multiple pallet consignments.

General haulage

Farm machinery manufacturers and farmers have our diverse equipment fleet at their disposal for their transportation needs alongside a MOT testing facility for horse box’s and brake testing facilities for farm trailers if required.

The industrial plant services team are also on hand to provide solutions for greenhouse heating plants, such as boiler house and CHP power plant installations.

Our vast fleet includes hydraulic lift systems, cranes, skidding and jacking systems, girder frames, SPMTs, modular trailers, bespoke rolling stock trailers, beam trailers, vessel beds, wafer decks, and semi-low loaders.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.

Lets Talk...

We would love to hear more about the challenges you are facing. This form below will help us understand that project better and one of our experienced members of the team will be pleased to help you.

slash-brand-left-s