Rail Industry experts

Maufacturers, leasing companies and operators have turned to us for over 35 years to support their rail projects within the UK and Europe.

From ro-ro operations, transportation and crane lifts, through to engineering, project management, scheduling, permits and route surveys, we’re able to offer our clients a complete logistical solution.

Dedicated equipment fleet

Our storage and warehousing facilities offer space for rolling stock components such as bogies and engines, with both long and short term options available to our customers.

We have a general haulage fleet of vehicles that service the rail sector with the transportation of items such as spare parts and smaller rail wagons. Our heavy haulage fleet also offers a multitude of trailer configurations meaning that we can transport everything from small coaches and trams of any length up to a mainline locomotive.

Bespoke solutions

We’ve built close working relationships with our suppliers, so that we’re able to provide our customers with the best equipment and solutions possible. Our equipment suppliers are knowledgeable and reliable, they also know our standards and are on hand to deliver bespoke industry leading trailers specifically for rolling stock. This enables us to service any rail contract from heritage projects through to major infrastructure projects such as HS2.

slash-brand-left-s

Excellence Delivered

Case Studies

Each and every project is unique. Our vast service offering and extensive equipment fleet enables us to work on some of the most exciting and challenging projects within the UK. Take a look at a selection of our case studies below.

Allelys have successfully completed the transport and crane lift operation for the installation of a 146te Yankee drying cylinder at Shotton Mill in Flintshire.
Allelys’ AK912 mobile crane returned to the UK market to lift critical infrastructure at Port of Sutton Bridge. This project marked the AK912’s first project lifts since the crane underwent a full refurbishment.
Allelys has successfully delivered a turnkey solution for the transport and installation of critical equipment at the Lostock Sustainable Energy Plant.
Allelys have successfully completed the transport and installation of a 309.5te turbine, 326.1te generator and 221.8te transformer from Newport Docks to Hirwaun Power Station.